|
COMMERCIAL WORK
- Great Barrier Walkway
Our HB80 Condor concrete pump was barged to Great Barrier Island to pour 110 cubic metres from the barge at sea level up to the road, 310 lineal metres away. Dry material, the concrete plant and the concrete pump and equipment were loaded on to the barge in Auckland. Concrete was mixed on the barge by Sitemix NZ Ltd and we used 5.5" pipeline reducing to a 4.0" hose for placing.
- Auckland International Airport
- Waitakere Stadium
- Waitakere Council buildings
- Middlemore Hospital
- Auckland Hospital
- Apartments
- Mitre 10 complex Albany
- 604 Gt South Rd Greenlane
- Sylvia Park carpark
- Nugent Street, Newmarket
- Mission Heights School, East Tamaki
- Britomart Square, Auckland City
- Council buildings, Takapuna
|
|